- All tools built for high volume production levels. Number of cavities meet the program requirements.
- Tool designs reviewed with customer to insure all aspects meet requirements: gates, eintors. parting lines, etc.
- Mold flow analysis performed to minimize flow lines, high stress areas, insure proper mold filing
- High maintenance areas are built on inserts to minimize downtime: spare inserts maintained as required.
- Tooling maintained during production phase of the program and production volume levels are sustained.