Production Tooling

 

  • All tools built for high volume production levels. Number of cavities meet the program requirements.
  • Tool designs reviewed with customer to insure all aspects meet requirements: gates, eintors. parting lines, etc.
  • Mold flow analysis performed to minimize flow lines, high stress areas, insure proper mold filing
  • High maintenance areas are built on inserts to minimize downtime: spare inserts maintained as required.
  • Tooling maintained during production phase of the program and production volume levels are sustained.
Copyright © 2017 | JHM Consolidation Barhad (686148-A). All rights reserved.
Powered by IS Eleven Services.